Statement of Qualification

  • ENCODY, Inc. has acted both as General Contractor or Subcontractor in the following construction projects.  Our staff was responsible for management and quality control of works included in our scope of responsibilities.

 

  • Design & construction of polymer system at Patillas WWTP, Patillas, P. R., March 1996. $10,673.00  Mr. Francisco Irizarry, Project Eng., P. R. A. S. A.

 

  • Designed, furnished & installed a fine bubble air diffuser system at Syntex (F. P.), Inc. WWTP, Humacao, P. R., April 1987.

          $4,720.00  Mr. Eduardo Cordero, Environmental Manager

         ICN Pharmaceutical, Inc., Humacao formerly Syntex (F. P.), Inc.

 

  • Furnished & installed a secondary wastewater treatment system, Narciso Rabell School, San Sebastían, P. R., October 1987.

          $59,139.00  Mr. Luis Vargas, President

          MOSS Construction, Inc., Moca, P. R.

 

  • Designed, furnished & installed chlorination and flow monitoring systems at wastewater treatment facilities for Hospital Castañer, Lares, P. R., August 1988.

          $4,807.00  Mr. Ismael Ríos, General Manager

          Hospital Castañer, Lares, P. R.

 

  • Furnished & installed a tertiary wastewater treatment system for Bo. Daguao School, Naguabo, P. R., January 1989.

         $91,841.00  Mr. José a. Fernández, President

         Fernández & Gutiérrez Contractors, San Juan, P. R.

 

  • Installation of three (3) flow and pH monitoring systems at Pepsi Cola Bottling co., Río Piedras, P. R., April 1989.

          $23,420.00  Don White, Project Manager

          Pepsi Cola Bottling Co., Río Piedras, P. R. (Relocated to Toa Baja).

 

  • Furnished & installed a fine bubble air diffuser system for the equalization tanks of Cheesebrough Ponds, Inc., Las Piedras, P. R., September 1989. $35,000.00  Mr. José Ortiz, Engineering Manager Cheesebroughs Ponds, Inc., Las Piedras, P. R.

 

  • Furnished & installed a tertiary wastewater treatment system for Guadiana Chinea School, Naranjito, P. R., December 1990. $125,560.00  Mr. Neftalí Rivera, General Manager SANRO Construction, Río Piedras, P. R.

 

  • Installation of three (3) flow and pH monitoring systems at Pepsi Cola Bottling co., Río Piedras, P. R., April 1989. $8,375.00  Mr. Aníbal Laboy, Eng. Manager McNeil Pharmaceutical Co., Dorado, P. R.

 

  • Design & construction of activated sludge system to upgrade the existing wastewater treatment facilities of Syntex (F. P.), Inc. WWTP, Humacao, P. R., October 1991. $99,000.00  Mr. Carlos Rodríguez, Maintenance Manager

          ICN Pharmaceutical, Inc., Humacao, P. R.

 

  • Furnished & installed a lift station, equalization, sequential batch reactor, digester, and sludge dewatering system and related instrumentation at Loctite, Inc., Sabana Grande, P. R., September 1992. $527,000.00  Mr. Waldermar Carmona, President  Constructora de Hato Rey, Hato Rey, P. R.

 

  • Designed, furnished & installed a fine bubble aeration system at sequential batch reactor system of Ortho Pharmaceutical, Inc., Manatí, P. r., October 1992. $48,000.00  Mr. Enrique Thiele, Project Engineer Ortho Pharmaceutical, Inc., Manatí, P. R.

 

  • Furnished & installed of polymer preparation, flash mixers, flocculators, tube settlers, backwash equalization and sludge dewatering system at Gurabo WTP, Gurabo, P. R., May 1993. $435,000.00   Mr. Carlos del Valle, President San Lorenzo Construction, San Lorenzo, P. R.

 

  • Design & construction of a complete wastewater treatment and sludge dewatering system for Danbury Phamacal Caribe, Inc., Humacao, P. R., September 1993.$265,102.00  Mr. José Álvarez, Project Manage Danbury Pharmacal Caribe, Inc., Humacao, P. R.

 

  • Design & construction of a complete sludge digestion and dewatering system for Cheesebroughs Ponds, Inc., Las Piedras, P. R., November 1993.  $52,000.00   Mr. José Ortiz, Engineering Manage Cheesebroughs Ponds, Inc., Las Piedras, P. R.

 

  • Design & construction of physicochemical pilot system for Cadillac Uniform & Linen Supply, Inc., Bayamón, P. R., December 1993.

         $45,000.00  Mr. Michael B. Shulevitz, President

         Cadillac Uniform & Linen Supply, Inc., Bayamón, P. R.,

 

  • Furnished & installed a wastewater lift station, neutralization and discharge monitoring system for Cadillac Uniform & Linen Supply, Inc., Bayamón, P. R., November 1995.

         $105,000.00  Mr. Alex Rosado, Plant manager

         Cadillac Uniform & Linen Supply, Inc., Bayamón, P. R.

 

  • Furnished & installed a complete pretreatment system including lift station, cooling, equalization, neutralization, activated sludge sequential batch reactors, color destruction, aerobic digester and sludge dewatering unit processes, their related instrumentation and controls at Lutania Mills, Inc., January 1996.

          $905,000.00  Mr. José Martí Sociats, President

          José Martí Construction, Inc., Hato Rey, P. R.

 

  • Construction of forced main including lift station, pump and controls for Coral Can, Inc., Guaynabo, P. R., September 1996.

          $14,177.00  Mr. José A. Sánchez, Director

          La Famosa, Inc., Toa Baja, P. R.

 

  • Design & construction of modifications to sequential batch reactors (AquaSBR) aeration system for NYCOMED, Inc., Barceloneta, P. R., December 1996.

          $71,986.00  Mr. Chendry Rivera, Manager

           NYCOMED, Inc., Barceloneta, P. R.

 

  • Design, equipment procurement, construction supervision, and startup of modifications to sequential batch reactors (SBR) pilot plant facilities for Abbott P. R. Operations, Barceloneta, P. R., June 1997. $44,890.00  Mr. Dario Collado, Manager Abbott P. R. Operations, Barceloneta, P. R.,

 

  • Furnished & installed three (3) Coplastix Sluice Gates to control spills into storm water system for Life Savers, Inc., Las Piedras, P. R., December 1998. $20,127.00  Mr. José Rodríguez, Engineer Director  Life Savers, Inc., Las Piedras, P. R.

 

  • Construction of poured concrete building with associated mechanical and electrical systems for the Federal Aviation Administration, San Juan, P. R., under construction January 1999.  $134,804.00  Mr. Thomas W. Kibler, Project Manager & Mr. Gail P. Edwards,    Contracting Officer, F. A. A., Atlanta, GA.

 

  • Furnished and install a wastewater neutralization and pH monitoring system for Rhone Poulene Rore, Inc., Manatí, P. R., February 2000. $44,735.00  Ms. Isabel Fernández, P. E., Consultant Process Design Group, San Juan, P. R.

 

  • Furnished & install a physicochemical pretreatment system including feed pumps, chemical conditioning, gravity separator, sludge holding tank and belt filter press, sludge dewatering system, related instrumentation and controls at Cadillac Uniforms & L. S., Inc., Bayamón, P. R., July 2000.  $298,096.00  Ms. Bizenso Cafaro, Engineering Manager Cadillac Uniforms & L. S., Inc., Bayamón, P. R.

 

  • Construction of poured concrete building to house the Emergency Generator for the Federal Aviation Administration, San Juan, P. R., under construction August 2000.$66,615.00  Mr. John G. Parsell & Mr. Gail P. Edwards, Contracting Officer, F. A. A.,

 

  • Furnish & install surface aerators at Isabela WWTP, Isabela P. R., 2012. $60,607.00  Phase I:   Mr. Jorge Ocasio, Maintenance Supervisor, PRASA West Region$71,926.00  Phase II:  Mr. Jorge Ocasio, Maintenance Supervisor, PRASA West Region

 

 

  • Furnish & install coarse bubble aeration systems for aerobic digesters at Ciales WWTP, Ciales, P. R., 2013.

          $44,000.00  Mr. Raúl García, Maintenance Supervisor, PRASA North Region

 